References

AT Complex

Locations

Foundation, element installations (framework)

Foundation, element installations (framework)

Foundation, element installations (framework)

Foundation, element installations (framework)

Foundation, element installations (framework)

Foundation contract

Foundation, element installations (framework)

Foundation, element installations (framework)

4 apartment buildings with 11-floors, foundation, element, HVAC and PV works (Framework)

Foundation, element installations (framework)

3-floor apartment buildings, foundation, Element installations (framework)

3-floor apartment bulding, foundation, Element installations (framework)

3-floor apartment bulding, foundation, Element installations (framework)

3-floor apartment bulding, foundation, Element installations (framework)

3-floor apartment building, foundation, element installations, PV vault (framework)

3-floor apartment building, foundation, element installations, PV vault (framework)

3-floor apartment building, parking garage, foundation, Element installations (framework)

apartment building, foundation, element, etc. works (framework)

12 floor apartment building, foundation, element, etc works (framework)

Foundation works for passenger bridges. in 2017 and 2019.

2 apartment buildings, foundation, element, cast-in-place vaults, etc. work (framework)

Apartment building, foundation, element, etc. works (framework)

2 apartment buildings, foundation, element, etc works (framework)

3 apartment buildings, foundation, element, cast-in-place vaults, etc. works (framework)

2×5-storey house, Concrete frame work incl. Frame element, cast-in-place vault, and VSS works.

Nursing home, cast-in-place frame, element, VSS installation work, with large formwork and table formwork equipment.
Water roof works

All tiling work

Foundation, cast-in-place frame, element, VSS installation work, skydeck, and with heated formwork equipment.
Water roof works

All tiling work

3rd floor House, precast, cast-in-place, vaults, and parking garage works.

Foundation, cast-in-place frame, element, VSS installation work, skydeck, and with heated formwork equipment.
Water roof works

All tiling work

3rd floor House, precast, cast-in-place, vaults, and parking garage works.

Precast, cast-in-place vault works (framework)

Foundation, element, etc. works (framework)